Key conclusions
A useful RFID enquiry describes the business task, reading equipment, deployment region, mounting material, dimensions, printing and data requirements, plus sample and order quantities. Mark unknown details as to be confirmed. Sample arrangements, MOQ, costs and lead times depend on the project quotation.
What to check before purchasing
- If the chip model is unknown, start with the task, equipment and operating conditions.
- Confirm RF hardware, printing and encoding separately, including data examples and verification requirements.
- Distinguish samples, the initial order and future demand, and agree delivery using approved samples and acceptance records.
First describe the task the tag needs to perform
Describe the business action in one sentence, such as “inventory folded apparel with a handheld reader” or “let customers tap a phone to open the product page.” Then provide item photos, mounting materials and equipment details.
If frequency, protocol or chip is undecided, explain the task and constraints and ask the supplier for options. With an existing system, prioritize equipment and software requirements, avoiding replacement based only on appearance.
- Application and deployment region: Who reads, when they read, and what action follows.
- Equipment: Reader brand and model, supported protocols, or target smartphones.
- Installation conditions: Materials, shape, available dimensions, attachment method and reading position.
- Environment: Temperature, cleaning, wear, outdoor exposure and potential contact with liquids or chemicals.
Confirm hardware, printing and data separately
RF design, visual printing and encoded data are related but separate deliverables. Chip requirements should include protocol and memory needs; printing files should specify dimensions, variable data and legibility requirements.
Encoding should specify format, generation rules, memory areas and whether verification or locking is required after writing. For EPC, confirm encoding against the applicable data standard. For phone taps, separately confirm content format and reading on target devices.
- Hardware: Frequency, protocol, chip requirements, dimensions, packaging and installation method.
- Printing: Artwork, colors, logo, text, barcodes or QR codes, and variable numbers.
- Encoding: Sample data, numbering rules, write requirements and verification methods.
- Packaging: Quantity per roll or pack, orientation, tag spacing and package identification requirements.
Define quantities and delivery scope for the quote
Distinguish samples, the first order and anticipated repeat demand. Specify the delivery location, desired date and any split deliveries. If quantity is undecided, provide quantity tiers to compare.
Confirm tags, printing, encoding, tooling or other one-time costs and shipping scope separately in the quotation. The checklist defines scope; it does not imply commitments to any quantity, free samples or fixed lead times.
Confirm samples and acceptance methods before volume production
Verify reading, appearance, installation and data writing using actual objects and equipment. Keep the approved sample version, artwork, encoding rules and acceptance procedure in one record for joint review by purchasing, technical teams and the supplier.
For temperature resistance, water resistance or other environmental requirements, specify actual conditions and the required test evidence. With metal or liquids, include testing after attachment in the confirmation process.
View the laundry tag care conditions and sample acceptance guide
Compare the full quotation scope
Use the same requirements to compare quotations. A unit price is only comparable when the product, services and delivery scope match.
Scroll horizontally to compare all four columns. Keyboard users can focus this table area and use the arrow keys.
| Check | Buyer provides | Supplier confirms | Evidence to check |
|---|---|---|---|
| Model and revision | Application, attachment method and the requested drawing or sample revision. | Quoted model, material, dimensions and revision; any proposed substitutions. | Dated specification, drawing and approved sample reference. |
| Chip and protocol | Reader model, deployment region, required read/write operations and data format. | Chip identification, supported protocol and configuration; compatibility checks still required. | Versioned specification and sample test results with reader settings. |
| Printing and encoding | Artwork revision, variable data, encoding rules and the required verification output. | Print scope, encoding service, data handover and whether verification is included. | Approved artwork, encoding file revision and agreed verification record. |
| Quantity tiers | Sample quantity, initial order, repeat-order estimate and quantity per design or code. | Minimum order and pricing basis for each tier; packing units and any quantity tolerance. | Quotation lines showing the quantity and specification used for each price. |
| One-time setup costs | Number of designs, data formats and any tooling or sample setup requested. | Separate setup, tooling and sample charges; what a repeat order would incur. | Itemized quotation and written conditions for reuse or changes. |
| Shipping and delivery scope | Destination, receiving requirements and the delivery scope to be quoted. | Freight, insurance, duties and taxes included or excluded; delivery term and named place. | Written delivery terms and an itemized freight quote for the stated destination. |
| Lead-time starting conditions | Required arrival date, approval steps and the expected timing of buyer inputs. | What starts production lead time, pending approvals and production versus transit estimates. | Written schedule tied to artwork, data, sample and order approval milestones. |
| Sample and batch acceptance | Actual use conditions, acceptance criteria, sampling method and reporting needs. | Test method, batch checks, traceability and the process for addressing nonconforming items. | Approved sample revision, agreed inspection plan and matching batch records. |
Use the RFQ checklist as the shared brief, then cross-check the quotation against the latest sample, artwork and specification files.
Download the RFQ checklistSources
Frequently asked questions
Can I request a quote without knowing the chip model?
Yes. Provide the application, reading equipment, mounting material, available space, data needs and estimated quantity. The supplier can propose options based on operating conditions, then validate compatibility using samples.
What are the MOQ and lead time for custom tags?
Confirm according to chip, packaging, dimensions, printing, encoding, quantity and delivery requirements. Ask separately about samples, initial orders and repeat orders; the project quotation determines the arrangements.
How can we avoid receiving readable tags that do not work with our existing system?
During sampling, verify frequency and protocol, equipment compatibility, data formats and system mapping together. Record reader models, sample data, verification rules and acceptance procedures, rather than checking appearance alone.


